Containerized LNG could be the latest product to be manufactured at the Skeena Industrial Development Park in Terrace. (Taisheng International Investment Services photo)

Chinese firm proposes LNG processing plant near Terrace

Project to be located within the Skeena Industrial Development Park near airport

A Chinese distributor of liquefied natural gas wants to build a processing facility near Terrace, next to the regional airport.

Top Speed Energy sent a letter to area residents on Oct. 16, seeking feedback on a facility that could process 150,000 tonnes of LNG per year – about 0.6 per cent of what’s manufactured at LNG Canada’s multi-billion-dollar facility in nearby Kitimat.

The project is small enough for the company to bypass federal and provincial environmental assessments, the letter said. It will instead submit a permit application to the BC Oil and Gas Commission and any required applications to the City of Terrace.

The facility would receive natural gas from a nearby pipeline, and then transport the finished product by truck to a terminal in Prince Rupert and on to domestic and international markets.

The number of containers is expected to be handled within the terminal’s existing capacity, and “is not a driver for terminal expansion,” said the letter, signed by Clark M. Roberts, the CEO of the firm’s Canadian arm, based in Burnaby.

The 1,187-acre plot of land, in a business park next to the Northwest Regional Airport, was bought in 2014 by Taisheng International Investment Services, which later signed a development agreement with the city. No additional roads will be built.

Residents and organizations have until Nov. 6 to send in written feedback. They can also request a meeting with the company.

This isn’t TSE’s first jump into LNG exports from B.C. to Asian markets. FortisBC, a utility company operating a liquefaction facility on the Fraser River near Vancouver, signed Canada’s first long-term supply agreement to produce LNG for export to China with TSE in July.

Under the two-year agreement, 53,000 tonnes of LNG will be shipped from the Tilbury facility in B.C. to China by summer 2021.

READ MORE: FortisBC eyes expansions after inking deal to send LNG by container to China

READ MORE: Pacific Northern Gas moves to reinstate full capacity and expand pipeline

TSE LNG Facility Letter by Brittany Gervais on Scribd

Like us on Facebook and follow us on Twitter

Just Posted

Robert Barron column: School bus rules should be respected

Motorists must NEVER pass a school bus with its stop lights flashing.

‘Nutcracker’ a hit with Cowichan audiences

A big crowd was entranced Saturday, Dec. 7 when the Royal City… Continue reading

Andrea Rondeau column: Remembering the windstorm of 2018; how prepared are you for an emergency?

Last year on Dec. 20 the Cowichan Valley was walloped by the worst windstorm in memory in the region.

Sarah Simpson Column: The good deed that blew up in my face

Why I’ll be ordering take-our delivery pizza from now on

Chloe Storie-Soth’s rugby dilemma

Shawnigan student has to choose between elite teams

VIDEO: Success of wildlife corridors in Banff National Park has advocates wanting more

Demand for more highway protection escalated after seven elk were killed by a semi-trailer near Canmore

Sharks beat Canucks 4-2 to snap 6-game skid

Vancouver visits Vegas on Sunday

Fans sing Canadian anthem after sound system breaks at BMW IBSF World Cup

The Canadians in attendance made sure their team and flag were honoured on the podium

VIDEO: Fire destroys Big White Ski Resort chalet

Social media eulogies peg the property, nicknamed “The Pharamacy,” as both loved and hated

Prince George RCMP use bait packages to catch porch pirates over the holidays

First-in-Canada program with Amazon looks to combat parcel theft

Nanaimo mechanical engineer creates thief tracking program

Nanaimo Thief Tracking lets users plot and share information about thefts online

Mayor wants B.C. to institutionalize severely mental ill people who are homeless

Those suffering from mental health conditions, such as schizophrenia, need specialized care, mayor says

Five things of note from Trudeau’s mandate letters to his ministers

Some marching orders come from the Liberal Party’s campaign, while others are new additions

Most Read